2011
      
      
        LW „BOGDANKA” S.A.
      
      
        
          29
        
      
      
        The programme of field trips
      
      
        In thrid day of the Conference, 26th November (Saturday) 
      
      
        the participants of IMF will have an opportunity to get fa-
      
      
        miliar with practical aspects of plough longwall operation, 
      
      
        with the used technique and technology of driving he-
      
      
        adings in LW Bogdanka S.A.
      
      
        A trip to the bottom of the mine is planned in three ex-
      
      
        ploitation fields, namely:
      
      
        Bogdanka,
      
      
         • 
      
      
        Nadrybie,
      
      
         • 
      
      
        Stefanow.
      
      
         • 
      
      
        The programme of field trips includes:
      
      
        presentation of development works:
      
      
         1. 
      
      
        parting of the exploitation field in order to separate 
      
      
        • 
      
      
        the winning, that is separate coal from gangue and 
      
      
        their transport to appropriately chosen destinations;
      
      
        new types of designs of heading support suitable for 
      
      
        • 
      
      
        longwall exploitation of coal using the plough tech-
      
      
        nique;
      
      
        innovative method of reinforcing and stabilizing the 
      
      
        • 
      
      
        sets of the heading support with simultaneous, im-
      
      
        mediate result – getting the roof supported through 
      
      
        the use of mechanical lining and simultaneous de-
      
      
        crease of the number of props between the sets and 
      
      
        adjusting the support to the cavity made in by the 
      
      
        roadheader through so-called variable overlap at the 
      
      
        bottom element of the support;
      
      
        chain-type lining creating continuity of the lining in 
      
      
        • 
      
      
        the headings and ensuring that the roof and side-
      
      
        walls are sufficiently protected during longwall ex-
      
      
        ploitation;
      
      
        new types of pumps for making cement mixes used 
      
      
        • 
      
      
        for filling the lining sacks;
      
      
        mechanization of near-face transport of materials 
      
      
        • 
      
      
        through the use of manouver tractors that relieve the 
      
      
        traditional transport realized through underslung in-
      
      
        ternal combustion machines;
      
      
        change from three-shift system of driving headings 
      
      
        • 
      
      
        to a four-shift system through the use of Self-pro-
      
      
        pelled Wheel Turning Station and performing length-
      
      
        ening of the transportation sequence together with 
      
      
        advance made during the shift.
      
      
        presentation of exploitation works:
      
      
         2. 
      
      
        the system of exploitation unit work based on the 
      
      
        • 
      
      
        use of plough longwall technique for coal exploita-
      
      
        tion. The plough complex is controlled from the sur-
      
      
        face and it allows to use such innovative coal seam 
      
      
        exploitation solutions like:
      
      
        a device for loading coal by the longwall head-
      
      
         --
      
      
        The programme of field trips